Projects
Welcome to our projects page, Here is a selection of projects that we are currently working on from around the world.
The Great Central Railway Reunification (Great Central Railway):
The proposals involve engineering operations to restore and reconnect the Great Central Railway between the Grand Union Canal bridge and the A60 bridge, including a viaduct, embankment reinstatement, track laying, and flood risk mitigation.
For further information please contact us through the icon below.
Abercorn Estate (Strong Drive Ltd):
The site is an existing housing estate, with proposals for nine new dwellings across three buildings. Furthermore Air Source Heat Pumps(ASHPs) are proposed as new additions to the site. A noise assessment is required per City of Westminster Council guidelines.
For further information please contact us through the icon below.
51 Cadogan Square Sound Testing (Atelier West):
CSG Acoustics is collaborating with Atelier West Architects to design optimized walls and floors for future occupants, including specifications and plant noise assessments with associated noise control measures.
For further information please contact us through the icon below.
Bullgogi Manchester (Maguro Ltd):
CSG Acoustics Ltd is working with MAGURO Ltd on a plant noise assessment for a planning application at Bullgogi, 6A Piccadilly Plaza, Manchester. The project includes a restaurant fit-out with ventilation, kitchen extract, and air conditioning. The assessment will cover noise limits, predictions, and impacts on the nearest residence.
For further information please contact us through the icon below.
Fierra di Roma Convention Center (MBS and Scomac):
We are assisting a large multinational film studio to appraise the feasibility of occupying the site in Fiera di Roma. For the following site a portion of it will be developed into four sound stages, CSG Acoustics are collaborating on the project to provide an acoustic input to assist the design team.
For further information please contact us through the icon below.